|
3 February 2005
February was a miserable month. Our timber frame should have gone up but didn't even arrive. The freezing weather made life on site tough and slowed everything down. And a great deal of time was spent digging holes and looking down drains.
Here, the final form of the slab with pond and retaining wall attached sits expectantly.
|