1 August 2005

The highlight of August was building the roof. The joinery involved was complex, in part because the design was aesthetically elaborate, in part because the roof's big pitch to the south, to maximise solar gain, required some tricky engineering.

Here Steve and Mark prepare the Douglas Fir trusses prior to their installation.